Manage Scheduling
The Scheduling management screen is accessible from the menu:
Scheduling → Manage.
Screen Overview
The screen displays a summary table with all created schedules.
For each schedule, the following information is shown:
- Schedule name
- Validity period and times
- Associated channels
- Linked resources
- Linked layouts
Available Actions
Using the Manage button, you can:
- Directly assign channels to the schedule.
- Link resources to be played.
Using the Edit button, you can update the schedule details (e.g., name, period, times).
The Delete button removes the selected schedule.
Practical Tips
- A schedule can be associated with multiple layouts, channels, or resources, allowing content diversification within the same timeframe.
- In case of conflicts between multiple schedules, priority is always respected based on time and defined settings.
- The same schedule can be combined with different players, making management more flexible.
Questions?
For additional support, open a ticket.Last updated: October 2025